January 20 Pumpkin Key to Rodriguez Key 27 7 miles

Selasa, 22 Maret 2016

0 komentar
It worked like clockwork. The alarm got us up at 6:30 and after coffee we were underway at 6:50 and Angelfish, which we feared, was easy; no soundings of less than 8.2 feet. We were through it by 7:50.
The tide flowed strongly against us in the Creek, with surface eddys swirling, as in the East River back home, and the wind in our faces, both of which slowed us down, which is good if you fear a grounding. So you can chalk us up in the group that holds that Angelfish is doable in a 5 8" draft hull. (High tide was at 8:10.)

Once out in Hawk Channel the depths were in the teens and we ran under Genoa alone at speeds of up to 7.5 knots with the wind a bit forward of the port beam. Yes, we actually got to sail!!!  Yesterday and today we were greeted by dolphins again after a long absence from them in Dade County. Hawk Channel is wide and marked by buoys.

We were anchored behind Rodriguez Key by 11:30 am.  The key is a big uninhabited, wooded oval l.8 miles long and 1/4 mile wide, which lays east to west. It is a nature preserve, girded by mangroves, with no apparent means to reach it by land, sea or air. On its north side, between it and Key Largo there is room for a hundred boats to anchor in 7 to 9 feet of water. We were the only boat here when we arrived, later joined by eight others. The winds were from the SE and hence the key provided little protection from them or the waves they kick up, but mild winds were predicted for the evening and night.

We were here so early that I wondered if one could tie up a dinghy on Key Largo (Spanish for Long Island?), a mile away. Yes, but only by the payment of $20! My curiosity to explore a bit of Key Largo was not that strong. We also thought to play with the SUP which has not been used since we rented it back in Miami Beach. But the day was not pleasant, cool, grey over head and showers predicted, so we did not do that either. And not many chores -- a low tie of the genoa to its roller furler was redone, as was the lower tie of Old Glory to her staff. The hose from the gas tank to the outboard now works again. I am so lazy these days. reading, writing and laying around. Is it possible that Im slowing down?

Read More..

Spira International 27 Foot Boat Plans Build Costs

Sabtu, 19 Maret 2016

0 komentar
This will be my first keel up boat build.Well,unless you count the single person knock together boats I have built.I have rebuilt and restored a number of boats by myself and with friends.I even held a job doing interiors and upholstery in boats.

The one main factor is the cost of building the hull and cabin.I will layout the cost to build the 27 foot trailerable Spira International boats.I am using the bill of materials(BOM) off of the study plans that are available on the Spira International website.Its good to be able to get an idea of what costs are involved before building.Most other designers require you to purchase a study plan to get an idea of whats involved to build their design.You may still be required to buy the full plan set to get the BOM.This is a bad business practice in my mind.With the BOMs in hand,I started getting the numbers together and adding up cost.I will layout the cost break down and then give some ideas on how to cut some costs.I will start laying out things and end with the boat I have chosen as the design I plan to build.

The Elements of Boat Strength

Suppliers for pricing are as follow.
Lowes Wood supplies.
Home Depot Wood supplies.
Raka Epoxy and fiberglass.
Fastenal Screws and bolts.
McMaster Carr Screws and bolts.
DuckworksBBS Duckworks carries some of the odd size screws called for in the plans.

Avoid treated woods as much as possible.Treated wood usually contains traces of copper which corrodes fasteners and any other metals that come in contact with it.Even painted it can still leech copper.Also,copper is bad for the marine environment and is illegal to use in bottom coatings in some areas.

I prefer A/B fir plywood but will accept A/C fir,if its good quality.Avoid plywood with voids and footballs if possible.

I only use stainless steel fasteners for the extra corrosion resistance.Most of them will be sealed in with epoxy.I only use Raka epoxy kits with non blush hardener.

50 inch width is considered standard width for fiberglass boat cloth.Try to purchase all of your fiberglass cloth at one time.It saves a lot of money.

Bahaman Hull only No BOM for cabin.
$105=240 ft. 2x4
$40= 38 ft. 2x8
$60=2x stock for transom splash well
$78=180 ft. 1x4
$75=170 ft 1x4 decking-You can use decking or epoxy coated and painted 1x4 choice is yours.
$50=1x stock for rail cap-A good hardwood works well but is costs more.
$297=9 sheets 1/2 in. plywood
$195=5 sheets 3/4 in. plywood
$219=500 #10x3 in. screws
$196=2000 #8x2 in. screws
$338=5 gallons epoxy
$259=50 yards 6oz fiberglass cloth
_________________________
$1912=total

You can look at the cost of other models to gain and idea of the cost to build a cabin.I estimate between $300 and $500 depending on length of the cabin.

Chubasco
Hull Only
$264=8 sheets 1/2 in. plywood
$142=10 sheets 3/8 in. plywood
$103=240 ft. 1x4
$79=180 ft. 2x4
$341=1000 #10x2 1/2 in. screws
$30=250 #8x2 in. screws
$76=5/16x4 in. machine screws
$26=5/16 in. nuts
$9=5/16 in. washers
$60=12 ft. 5/16 in. threaded rod-washers and nuts included above price
$5=four 1/4 in.x 4 in. lag screws
$338=5 gallon epoxy
$25=3 in. glass tape 50 yards
$311=60 yards 6oz fiberglass cloth
_____________________________
$1809=total

Decking
$36=80 ft. 1x4
$99 =3 sheets 1/2 plywood
$25=250 #8x1 1/2 in. screws
$30=deck finish
_____________________________
$190=total

Cabin
$29=62 ft. 1x4
$58=2 sheets 5/8 in. plywood
$165=5 sheets 1/2 in. plywood
$25=250 #8x1 1/2 in. screws
$55=2 quarts epoxy
$46=8 yards 6oz fiberglass cloth
____________________________
$378 total

$2377 total hull,deck,and cabin

Cane River
Hull only-The cost for Chubascos cabin would be close.
$284=20 sheets 3/8 in. plywood
$462=14 sheets 1/2 in. plywood
$131=300 ft. 2x4
$47=240 ft. 1x3
$50=55 ft. 2x8
$341=1000 #10x2 1/2 in. screws
$188=100 5/16x4 in. screws
$26=100 5/16 in. nuts
$9=100 5/16 in. washers
$245=2500 #8x2 in. screws
$608=10 gallon epoxy
$622=120 yards 6oz fiberglass cloth
_______________________________
$3013 total

San Miguel
Hull only-The cost for Chubascos cabin would be close.
$142=10 sheets 3/8 in. plywood
$330=10 sheets 1/2 in. plywood
$172=6 sheets 5/8 in. plywood
$105=240 ft. 2x4
$55=280 ft. 1x3
$16=32 ft. 1x4
$171=500 #10x2 1/2 in. screws
$196=2000 #8x2 in. screws
$798=15 gallons epoxy
$518=100 yards 6oz fiberglass cloth
________________________________
$2503 total

Sitka
This is the boat I am planning to build.I will stretch it to 30 feet and build the V entry bow per the plans.
This total will be to build Sitka at 27 feet.Add approximately $200 to $300 to build to 30 feet with the V bow.
Hull Only
$105=240 ft. 2x4
$85=125 ft. 2x6
$30=32 ft. 2x8
$50=100 ft. 1x4
$199=14 sheets 3/8 in. plywood
$396=12 sheets 1/2 in. plwood
$113=6 sheets 5/8 in. plywood
$451=60 yards 6oz fiberglass cloth
$498=8 gallons epoxy
$97=300 #10x3 in. screws
$98=1200 #8x1 1/2 in. screws
$176=60 ft. 1x8
_______________________________
$2298 total

Cabin
$31=64 ft. 1x4
$141=48 ft. 1x8
$462=14 sheets 1/2 in. plywood
$XXX=12 yards 6oz fiberglass cloth-price included in bulk order above
$182=2 gallon epoxy
$25=200 #8x1 1/4 in. screws
______________________________
$841

$3139 total for hull and cabin

Newfie.Some may notice that I didnt include Newfie.I really like that boat, but it has a very small interior and there was no BOM on the study plans.

Boat Building Manual

There are some ways to cutting material costs.I added a few above.

Lumber.Find a local saw mill and have the lumber cut to full boat length.You could also use trees from your property.Make a deal to get your lumber ordered filled and let the mill have the rest to sell as payment.This can be tricky as some saw mills are mobile while others require you to haul your wood to the mill.This option takes longer and requires a place to store the wood while it finishes drying out.The best option for most people will be finding a local builders supply.They get huge loads of lumber with a volume discount.If you buy enough,they sometimes will negotiate for  lower price.Also,there wood tends to be better quality than most places like Lowes and Home Depot.

Fasteners.I recommend finding a local supplier and purchasing everything at once plus 10% to build the hull and/or cabin.Later when you need fasteners and hardware to finish out the boat,you can possibly negotiate for a slight discount on pricing.Hey,every little bit helps.

Epoxy.Some epoxy manufactures set a shelf life for their products some do not.I have had epoxy either, go bad, or it was a bad batch.Which,I am not sure.Epoxy is heavy and can get expensive.Try to buy in bulk to save on cost and shipping.Its best if you can find a dealer or supplier.Be careful tho.Their mark up may be a lot higher than ordering a kit.Shop around.I like Raka because they have an easy mixing system.

PL glues.I have had bad experiences with these, so I stay away from them.My main gripe is the ability for PL and epoxy to stick together.I built a knock together plywood boat and when I sheathed it in fiberglass and epoxy,the area around the PL let go.I wont knock PL glues, but theyre not for me when boat building.


My next installment will include more ways to cut cost during fit out and finishing.


Practical Encyclopedia of Boating


Read More..

October 27 November 14 ILENE Is Ready for the Winter

Sabtu, 30 Januari 2016

0 komentar
White, unpainted bottom.  Six work days took place during this period, (totaling 30.75 hours - so Im not working too hard) and two fun days as well.
Why not start with the fun. There was an emergency meeting at the Club because of a failure of a quorum at an earlier meeting. This one took only five minutes and we accomplished two ministerial tasks so they can be acted upon at the next meeting. And then a delicious Moroccan style buffet was served. So this not being a food blog, I will refrain from telling you about the menu -- except for the apple cake, which, based on the flavor and moistness and icing I would have called a carrot cake, except the moistness came from chopped apple instead of grated carrot. And I ended up sitting at the table with the Clubs book group, twelve women and three men, and enjoyed their discussion of "A Man Called Ove" even though I had not read the book.
The other fun event was the 20th Annual Gow Dinner, sponsored by Tex and Maria, who we dined with in Marathon Florida last winter. Tex pays for the whole meal so the full price of the tickets, $50/capita, goes to the Dow School to sponsor a scholarship in memory of their son, who was a student there, until he tragically died in a motorcycle accident. Tex and Maria flew up from where they had left their boat on their way south. I have contributed the cost of two tickets every year for the last twenty, including those when we were south and could not attend in person. Tex is a PC at the Harlem and also a member of the Huguenot, and this year the event took place at the Huguenot. Tex and Maria have a large circle of friends at both clubs and elsewhere, so attendance was good. Somehow, I had forgotten to send in the check so they had no reservation for us, but another PC, who did have reservations could not come at the last minute so we were seated at a table of Harlemites. Tex made a speech, and in his tradition, cried.

Basically the work involved winterization of the water systems and installation of the blue canvas cover with a few other chores started or completed. I had a big problem with the winterization, having sort of forgotten one important ingredient: It is a two man job, one to pour in the pink propelyne glycol and the other turning on and off swtches and faucets and waiting till the discharge appears pink. I got stuck and called upon Ed Spallina, who came in from Connecticut to help me. I used four of his very inexpensive hours and had the pleasure of taking him to lunch at the New Rochelle diner, sort of hidden in plain sight near the Home Depot. Ed is not "certified" as a technician, but he is magically able to figure out how things work. I had drained the raw water strainer, of its sea water through a screw at the
bottom, but had never been able to remove its stainless steel filter basket, because I did not know how to get it open. Well now I know that the top screws off and it is a good thing we looked inside because the basket was substantially corroded away. With this picture and a few measurements, I expect to be able to get a replacement basket that fits. Without its straining, particles are likely to be sucked through the engine causing major problems. Ed also bypassed the hot water heater after draining it, by detaching the two hoses that (1) feed cold water to the heater and (2) take hot water from it and connecting them to each other with a black plastic piece with hose barbs at both ends. I had the piece but had not figured out how to use it. Also, we detached the hose that takes fresh water from the tanks to the fresh water pump, and inserted a three foot long piece of hosing cut from the spare hose left over from the water maker installation job of 2010, and inserted a funnel at the top end. So now I do not need to pour so much of the pink stuff into the tanks, but can pour it directly into the pump. This year I used 14 gallons of the stuff. Next year, half that amount!
The cover comes in two pieces and installing it is a bear. On the day before, I scrubbed the topsides, and removed most of the stains in the fiberglass deck caused by the decay of fallen maple leaves -- they put ILENE under a big maple. Im on deck, about 14 feet above ground with the life lines removed and have a lot of lugging and heaving to do to do to get the cover into place and zip the two halves together. It took me four hours. And the problems involved the zippers. In the spring of 2014 when I took the cover off, I noticed that the aft most zipper on the port side was broken. I meant to take the big piece in to Doyle Sailmakers to get it fixed but I forgot. So at the end of the day, the cover was on, but with one inoperative zipper, about ten feet long. I was too tired to take it that half off, fold it up, put it in the car and take it to Doyle. Plan B was to sew across the gap and that took several hours the next day, with a tough job of pushing the needle into the fabric, using the palm to get it most of the way through and then pliers to pull the end through. Good exercise for the core muscles, doing this while balancing on the top of the step ladder. And at the end of the day I noticed another bad zipper, the one that closes the cover up above the swim platform, through which we enter, though it will hold this season.
I could not remove the sensor that measures speed through the water from the through hull where it had been painted in over the years. But Ed had a pliers with a large enough jaws to grab it and that is done. And I bought butt connectors and shrink wrap tubes and spiced the five wires from it to the five that lead from there to the power source and display. Final test: I asked a man working on a nearby boat to spin the wheel that protrudes from the bottom of the boat after I turned on the instruments and got to the cockpit where I could observe the display for boat speed. When he spun the wheel with his finger the instrument changed from zero to showing speed. Hooray! Then I took the tube with the wheel out and replaced it with the attached plug. The reason that the wheel kept breaking until now was the pressure of the heavy lifting strap against it. And the boat has a little plastic sign saying "Strap" telling the yard guys where to place the straps, so that the boat will be balanced in the two straps. Yep! -- right where the speed instrument is. So next spring, after the boat is back in the water, I will pull out the plug and then quickly insert the instrument into the hole through which the water will then be spurting.
The last part of the work involved the anchor and chain. The anchor was where the gap is in the cover at the bow.
I lowered anchor and chain to the ground using the windlass. Then I used (1) rust penetrating oil, (2) heat and (3) a hammer to break the seal and detached the anchor and its shackle and took them to the locker. The surprise was at the bitter end of the 300 feet of stainless chain, the end where it it attached to a "D" clamp it the locker. It was tied on with a square knot in 3/16 inch line, and not that strong Spectra stuff either! When I put it back, this attachment will be made fast with a stainless steel shackle. I have sawed off a large part of the horizontal 3/4 inch thick plywood platform on which the former Lectrasan was seated. This gives me better access to the chain locker and, I hope, will reduce the problem of the chain piling up and jamming the windlass while we raise the anchor. By sawing this off I got the vacuum cleaner hose and my arm into the locker to remove accumulated sand and rust particles and then scrub the rust stains of its interior walls. The half of the chain that goes into the water with each anchoring, is heavily rusted but otherwise still in good condition. The other 150 feet that have lain in the locker is white in this photo.
First I tied loops of it up behind the car and dragged it several blocks through the streets to grind off the exterior rust particles. The remaining work, in addition to installing the new brackets in the spring, is to scrape off 90 percent of the rust on the interior surfaces of each link.





Below is part of the boat, with its cover. At the top is the bottom of the blue canvas. below that, to the right is the aft portion of the bottom with its several coats of grey barrier coat, partially covered with what is left of the blue anti-barnacle paint. To the left, going forward, is the white gelcoat, after the paint was removed. After I touch up this surface it will put on several coats of barrier coat and then several coats of bottom paint. But that will take place in the spring.

Read More..

May 27 29 First Three Days Home 0 Miles

Kamis, 28 Januari 2016

0 komentar
John and I visited our mutual friend, former HYC member Nick, at the Hebrew home for the Aged in Riverdale, The Bronx, overlooking the Hudson. He has a nice single room with river view but we met him downstairs and had a pleasant time with him. Both John and Nick are retired carpenters and both agree that Nick taught John how to sail. We three will get together later this summer with some other current and former Harlemites and take Nick out for a day on the water. John left me in Manhattan and drove back to Maryland while I got picked up by Steve (who took us for a powerboat ride in Florida) to my first meeting of the Book Group, at the home of former Harlemite, Jim, in Chatham NJ, for a lovely evening with To Kill A Mockingbird.
I visited ILENE for about three hours by subway to pick up some things, clean and scrub out the refrigerators and empty the bilge. I also planned to "pickle" the water maker for winter. Winter is a long way off you might say. Well the water maker is a great tool for remote places where fresh water is difficult to obtain, but a burden in that it requires that it be flushed out for three minutes every five days. I can do this either by visiting the boat, or by leaving the electricity and fresh water pump on, in which case it will do this every five days, automatically. Another thing: It needs non-chlorinated water, the type it makes, for the flush. We have taken to keeping city water in the port water tank for our own use, and making non-chlorine water in the starboard tank for flushing. This also means changing the source of water to the fresh water pump to be from the starboard tank when we are about to flush and back again after the flush. A nuisance, and it means we use the water from only one of our two tanks. So this summer, when city water is available everywhere we plan to go, we have decided to shut down the water maker. This requires propylene glycol, the pink antifreese [My computers keyboard requires me to substutute as "s" because its key for the correct letter is broken] we use in the fresh water system and heads. I have to buy two gallons of the stuff, so another visit is needed -- in the next five days -- to do this job, and others.
I also calculated the mileage, dock to dock, for the nine planned passages of the Harlems 2015 cruise to Block Island and consulted with PC Bruce, who laid out the itinerary. Next step is to figure out what time the tide is favorable on the days for each of those nine passages, especially at the eastern exits from Long Island Sound, where the currents run wicked fast. I contacted (1) Barnacle Buster to set up a bottom cleaning schedule and to enlist him to fix the prop rattle by adjusting or removing the Spurs line cutter, and (2) my insurer, Pantaenius, to reduce the geographic scope of our coverage, now that we will not be going south of NY for the next few years.

Coming your way within weeks will be a statistical compilation of the 230 days of our winters cruise: passage days, miles per passage, total miles, nights on anchor-mooring-dock-or at sea, number of ports visited and how many times in each, how many were new first-time ports for ILENE, average number of lay days per port, how many lunches and dinners off the boat, etc. Yes, I am a confessed compulsive quantifier. I have done this following our prior long cruises. You could do it yourself if you were so inclined -- or should I say possessed) based on the data in the posts of this blog.



., ,
Read More..